Approvals needed in the sanction stage

Approvals needed in the sanction stage

Environment Clearance is required from Ministry of Environment and forests (MEF): State level expert committee for all building/construction projects having built up area more than 20000 square meters and area development projects/ townships covering an area more than 50 hectare or built up area more than 1, 50,000 square meters.

Approval from Central Vista Committee: Approval is required from the Central Vista Committee (CVC) when the project site lies within the boundary of Central Vista in NDMC area.

Approval from Chief Controller of Explosives: Approval is required from the Chief Controller of Explosives, Nagpur in case of hazardous building or for storing of hazardous materials in the building(s).

Approval from Delhi Metro Rail Corporation: NOC is required from the Delhi Metro Rail Corporation (DMRC) when the project site is along or on the metro alignment or lies within 20 meters on either side of the metro alignment / MRTS corridor (outer line of a metro line/ structure).

Approval from Delhi Urban Art Commission (DUAC) for the proposals at layout plan stage as stipulated in the DUAC Act.

Approval from Chief Fire Officer: Approval /Fire Safety Certificate is required from Chief Fire Officer (CFO) / Director, Delhi Fire Service for the proposals at layout plan stage as stipulated in the Delhi building bylaws and National Building Code (NBC).

Approval from Forest Dept.: Approval is required from the Forest Department, GNCTD when there is a proposal for tree cutting/ felling and transplantation at the site.

Approval from GNCTD: NOC is required from the Government of National Capital Territory of Delhi (GNCTD) when the project site is within 500 meters on either sides of Major Surface Transport Corridor like BRTS.

Approval from Heritage Conservation Committee: Approval is required from the Heritage Conservation Committee (HCC) when the project has any link/ relation with any listed heritage building and precincts (as notified by DDA, MCD, NDMC from time to time) and within their compound.

Approval From National Monument Authority: No Objection Certificate is required from the National Monument Authority (NMA) / Archeological Survey of India (ASI), when the entire project site or part/s of it is within 300 meter radius from the declared boundary of any monument protected under Ancient Monument Act and is under the control of ASI.

Approval From Road Owning Agency: NOC is required from the Road Owning Agency (MCD, Delhi PWD, NDMC, DDA) when cutting of footpath or road or service lane or Right of way (ROW) is involved.

Approval From Traffic Police: NOC is required from the Delhi Traffic Police when the proposal involves disruption of general traffic movement/ circulation pattern temporarily or permanently during and after the construction of the project.

Approval From UTTIPEC: Clearance is required from the Unified Traffic and Transportation Infrastructure (Planning & Engineering) Centre (UTTIPEC) of DDA for all transportation projects/ transport engineering solutions in Delhi by any agency having road engineering/ infrastructure implication.

 